Environmental Protection Acceptance


According to the "Interim Measures for the Acceptance of Environmental Protection for the Completion of Construction Projects", "Technical Guidelines for the Acceptance of Environmental Protection for the Completion of Construction Projects", "Environmental Impact Report Form for Plastic Packaging Box Production Projects" and the Jimei Branch of Xiamen Environmental Protection Bureau (now Xiamen Jimei Ecological Environment Bureau) Approval and other requirements for acceptance of this project. After careful discussion and review, the following acceptance opinions are formed:

 

"Plastic packaging box production project completion environmental protection acceptance monitoring report form" is more standardized, in line with the "construction project completion environmental protection acceptance technical guide pollution impact category" requirements. According to the on-site verification results and the test report provided by China Testing General Standard (Xiamen) Testing Technology Co., Ltd., the project can basically implement the environmental protection "three simultaneous" system and various pollution prevention measures proposed in the approval of the environmental assessment document, and the acceptance data are basically complete. The "Interim Measures for the Acceptance of Environmental Protection for the Completion of Construction Projects" (National Environmental Regulations and Environmental Assessment No. 4 2017) Article 8 stipulates that, the construction of the project does not exist can not put forward the acceptance of qualified opinions of all kinds of circumstances, agreed that the project through the completion of the environmental protection acceptance, the plastic packaging box production project environmental protection acceptance content publicity is as follows:

 

Construction Project Name: Plastic packaging box production project
Name of Construction Unit: Xiamen Dacheng Plastic Co., Ltd
Construction site: Unit 503, No.19 Baihuyan Road, Jimei District (5th Floor)

 

Link: https://pan.baidu.com/s/1qjKrpqp2XqHvy5Qv4HufSQ

Extraction code: 83dw

 

Publicity content: acceptance report and acceptance opinions, see annex for details.
Publicity time: November 12, 2020-December 2, 2020
During the publicity period, if you have any objection to the above publicity contents, please give feedback in writing. The individual must sign his real name and the unit must affix his official seal.